(603) 555-0129 Free estimate

Family-paved driveways since 1998.

Ray Brisson and his daughter Kate pave driveways around Manchester with a small crew and set prices by driveway size. You'll know the number before we ever bring the truck.

Paving crew in safety vests working beside an asphalt paver and roller on a residential street
  • 4.9 143 Google reviews
  • Since 1998two generations, one crew
  • $1M insuredcertificate on request
  • 26 townswithin 30 minutes of Manchester

Three jobs, priced by driveway size

Pick the size closest to yours. Prices are for 2026 and include everything listed. Odd shapes and steep slopes we price on site.

Package prices for the selected driveway size
Included Overlay$2,700new top on a sound driveway Replace$5,300most homeowners pick this Gravel to paved$5,700first time paving
Old asphalt removedNoYes, recycledNot needed
Gravel baseSoft spots onlyTopped up to 6"8" new base
Asphalt1.5" top2.5" in two lifts3" in two lifts
Rolled edges and apronYesYesYes
Days on site122 to 3
Written warranty1 year3 years3 years

About 800 sq ft. Sealcoating a year later: $240 to $380. Minimum job $1,800.

Recent jobs, with real prices

Three from last season. We post the size and the final bill because people always ask.

White cape house with dormers and a worn, cracked driveway leading to an attached garage
Bedford, beforeCape with a 1980s driveway, edges gone, weeds in the cracks. Replaced, 1,050 sq ft, $6,950.
Two-story white house with a detached garage and a long driveway across a wide lawn
HooksettLong drive to a detached garage, gravel to paved, 1,500 sq ft, $10,200.
Paving crew laying asphalt on a long private road with a paver and a green transfer machine
CandiaShared private road for four homes, 4,200 sq ft, split four ways: $6,400 each.

When to call, and when we pave

New Hampshire plants make hot mix from about late April to mid-November. The calendar fills from the front.

  • Estimates and bookingAll year
  • Early-booking priceJanuary to March, 5% off
  • Paving seasonLate April to mid-November
  • SealcoatingJune to September

5% off jobs booked January through March, for any date that season.

June and September are the best paving weather and the first weeks to fill.

Winter calls get a visit once the snow is off the driveway.

How a job goes

Five steps. The two days of paving are the short part.

  1. 01

    Free estimate

    Ray or Kate walks the driveway with you, checks drainage and where the water goes, and gives you a written price on the spot.

  2. 02

    Date and Dig Safe

    We put you on the calendar, call Dig Safe to mark buried lines, and text you a reminder three days out.

  3. 03

    Day one: dig and base

    Old asphalt comes up and goes to the recycler. We grade for drainage and compact the gravel with a plate and roller.

  4. 04

    Day two: pave

    Hot mix laid with the paver or by hand, rolled while hot, edges sloped and the apron matched to the road.

  5. 05

    Walk it together

    We walk the finished driveway with you before we leave. You pay then, by check or card. Drive on it after three days.

Ray driving the roller over fresh asphalt on a country road, a traffic cone beside it

Ray, Kate and a crew of three

Ray started Brisson Paving in 1998 with a pickup, a rake and a borrowed roller. Kate grew up riding along on Saturdays and came on full time in 2017. Today she runs the estimates and the schedule; Ray still runs the paver.

We stay small: one dump truck, one crew, about 120 driveways a year. That means one of us is on every job, and the price on the estimate is the price on the bill. Fully insured, $1 million liability.

Ray on the roller, finishing a shared road in Dunbarton last June.

From the neighbors

4.9 out of 5 from 143 Google reviews.

Linda P.Goffstown★★★★★

Kate came out in February, gave us the early price and a date in May. They showed up that exact Tuesday. The driveway pitches away from the garage now and the ice dam puddle is gone.

Mike T.Bedford★★★★★

Ray talked me out of the full replacement. Said the base was fine and an overlay would do. Saved me about $2,500.

Ann-Marie R.Candia★★★★★

Four households on one private road, and Kate split it into four invoices so nobody had to collect. Two winters of plowing and it still looks new.

Towns we pave

Our yard is on Valley Street in Manchester. Anywhere within about 30 minutes, with no travel charge.

Simple map of the Merrimack River valley with Manchester in the center and nearby towns we serve Merrimack River Manchester Concord Hooksett Goffstown Bedford Auburn Candia Londonderry Derry Merrimack Nashua Dashed ring: about 30 minutes

Also on our list

  • Allenstown
  • Amherst
  • Bow
  • Chester
  • Deerfield
  • Dunbarton
  • Hudson
  • Litchfield
  • New Boston
  • Pembroke
  • Raymond
  • Weare
  • Windham
  • Hampstead
  • Epsom

Not sure if you're in range? Call Kate at (603) 555-0129.

Questions people ask us

Anything else, ask Kate. She answers the phone.

Do I need a full replacement, or will an overlay do?

If the driveway is flat, drains well and the cracks are thin, an overlay is good value and lasts 8 to 12 years. Sunken spots, wide cracks and crumbling edges mean the base is gone, and an overlay would crack in the same places. We'll tell you straight.

Why is gravel to paved more than a replacement?

Because there's no old base to reuse. We dig out, lay fabric if the soil is soft, and bring in 8 inches of new gravel before any asphalt goes down.

How long until we can drive on it?

Walk on it the next day and drive on it after three days. For the first month, avoid turning your wheels while parked and keep trailer jacks and kickstands off it.

Will it hold up to plowing?

Yes. Ask your plow driver to keep the blade up a hair for the first winter and use shoes on the edges. We slope the edges so they don't break off.

Do you take a deposit?

No deposit for driveways under $10,000. Bigger jobs and shared roads have a 20% deposit when we book the date.

Can you match the price of a cheaper quote?

Sometimes the cheaper quote is a thinner job. Bring it to the estimate and we'll compare the base and asphalt depth line by line. If it's the same work, we'll talk.

Cracked old asphalt driveway in front of a white two-car garage with a chain-link fence
Look familiar? Send us a photo like this and we'll tell you which job it needs.

Book a free estimate

Kate will call or text within one business day to set a time. Estimates take about 20 minutes.

Driveway size

Call Free estimate