
Bathroom floors and shower pans
Old tile out, subfloor checked and stiffened, a waterproof membrane, then tile laid to the drain so water goes where it should. Most hall baths take four to five days.
- Bathroom floor, about 50 sq ft
- from $1,850
- Labor per sq ft, larger baths
- $12–$18
- Curbless shower pan with linear drain
- from $2,600

