(830) 555-0124 Book a site visit

Waterproofing done once, in the right layers.

Foundation walls, balconies, planters and retaining walls in New Braunfels and the Hill Country. We write down every layer before we start and photograph each one before it is covered.

A crew member in a cap spraying a cementitious waterproof coating onto a concrete block wall
Second coat of cementitious membrane on a block retaining wall in Gruene.
  • 4.996 Google reviews
  • 10 yearsWritten, transferable warranty
  • Since 2008740+ membranes installed
  • Comal & GuadalupeCounties, plus Hays and Bexar edges

Three systems, chosen for the job

There is no one coating for everything. This is how we choose, and what each costs installed, including prep and two coats or layers.

Comparison of three waterproofing systems
Cementitious coatingLiquid rubber membraneSheet or torch-on membrane
Best forBlock and poured walls, retaining walls, cisternsFoundation walls below grade, planters, odd shapesBalconies and decks under tile, flat roofs over rooms
How it goes onBrushed or sprayed, two coats, bonds into the concreteSprayed or rolled to 60 mil, seamlessRolled sheets, lapped 4 inches and heat-welded
Lasts15–25 years25+ years buried20–30 years under tile
Installed price$5–$8 / sq ft$7–$11 / sq ft$9–$14 / sq ft
Warranty10 years10 years10 years

Every job includes

  • A written layer spec before we start
  • Photos of each layer before it is covered
  • Flood test on balconies and planters, 24 hours
  • Warranty that transfers when you sell

What goes under the surface

Most leaks we fix come from a missing layer, not a bad product. Pick a job to see the layers we install, from the inside out.

    Typical project

    On site this season

    Three jobs, three different systems. Each one was photographed layer by layer for the owner's file.

    A yellow excavator digging a trench in dark soil beside a building site
    Foundation wall, Canyon Lake. Dug to the footing along 64 ft of hillside wall, liquid membrane, drainage board, new drain to daylight.
    Two workers in boots heat-welding a dark torch-on membrane strip with a flame torch
    Roof deck over a garage, Seguin. Torch-on base and cap sheet, lapped up the parapet, ready for pavers.
    A crew member in a blue hard hat kneeling to mix a bucket of coating with a drill paddle
    Mixing two-part coating for a cistern in Bulverde. Batch numbers go in the job file.

    How a membrane job runs

    Most projects take one to two weeks from site visit to final photos. Here is where the time goes.

    1. 01

      Site visit

      Walt measures, checks slopes with a level, probes the soil and asks about the history of the leak. Free in our area.

      1 hour
    2. 02

      Layer spec and price

      A drawing of each layer, the products by name, the dig plan if there is one, and one fixed price. Sent within three business days.

      3 days
    3. 03

      Prep

      Tile up or soil out, cracks routed and patched, surfaces ground clean and dry. This is the part that decides if it lasts.

      1–3 days
    4. 04

      Layers and testing

      Membrane, flashing and drainage go in. Balconies and planters get a 24-hour flood test before anything covers them.

      2–4 days
    5. 05

      Close up and file

      Backfill, tile or pavers back, site cleaned. You get the photo file, product list and the warranty in your name.

      1–2 days

    Walt Kessler and a crew of three

    Walt learned waterproofing on commercial jobs in San Antonio: parking decks, planters on hotel terraces, below-grade walls on hospitals. Those specs leave no room for shortcuts, and he brought the same habits to houses when he started Kessler in 2008.

    We still run one crew. Walt is on every site visit and at every flood test. Ben Ochoa has led the crew since 2013; Rosa Kessler runs the office and the warranty files.

    Insurance
    $2M general liability, workers' comp
    Training
    Manufacturer-trained installer for the membranes we use
    Member
    Greater New Braunfels Home Builders Association
    Warranty
    10 years, written, transfers to the next owner
    Walt Kessler in a navy work jacket holding up a drawing of a membrane detail inside a house under renovation
    Walt checking a balcony detail against the drawings before tile comes up.

    From homeowners and builders

    4.9 average from 96 Google reviews

    Our balcony had been "fixed" twice by other companies. Walt pulled the tile and showed us there was no membrane at the wall at all. He did it properly, flood-tested it for a day, and it has been dry through two wet springs.

    Linda H. Gruene

    The layer drawing and photo file made our home inspection easy when we sold. The buyer's inspector asked who did the foundation wall and wrote it down.

    Mark and Julie S. Mission Hills, New Braunfels

    I am a custom builder and I send all my planters and roof decks to Kessler. Never had a callback in six years. Not cheap, worth it.

    Tom R. Builder, Canyon Lake

    Where we work

    Based off Landa Street in New Braunfels. Site visits are free within 35 miles.

    Simple map of the service area around New Braunfels, with the Guadalupe and Comal rivers and nearby towns I-35 New Braunfels Gruene Canyon Lake San Marcos Wimberley Seguin Schertz Cibolo Garden Ridge Bulverde Spring Branch Guadalupe River Comal

    Regular stops

    • New Braunfels Home base
    • Gruene 5 min
    • Canyon Lake 25 min
    • Seguin 20 min
    • San Marcos 20 min
    • Schertz and Cibolo 20 min
    • Garden Ridge 15 min
    • Bulverde and Spring Branch 30 min
    • Wimberley 35 min

    Good questions to ask any waterproofer

    Ask us these, and ask the other bids too.

    Why is your price higher than the other quote?

    Usually because we include the parts that do not show: removing tile to get to the real problem, flashing at the walls and doors, drainage board, the flood test and the photo file. Ask the other bid to list their layers in writing and compare line by line.

    Do you have to dig to waterproof a foundation wall?

    For a true exterior membrane, yes, down to the footing. On Hill Country lots we often hand-dig near trees and use a mini excavator elsewhere. Where digging is not possible we will tell you honestly what an interior coating can and cannot do.

    Can you waterproof a balcony without removing the tile?

    Clear sealers on top of tile slow leaks down for a year or two. They do not fix a missing or failed membrane. We will tell you which one you have after a site visit, and we only offer the coating route if it will hold.

    What is a flood test?

    We dam the balcony or planter and fill it with an inch or two of water for 24 hours before tile or soil goes back. If the level drops or anything shows below, we find it while it is still easy to fix.

    When is the best time of year?

    Spring and fall. Membranes need dry surfaces and mild temperatures; we avoid the hottest August afternoons for torch work and wait out wet weeks. Booking is usually 3–5 weeks out.

    Do you work with builders and remodelers?

    Yes, about a third of our work is for custom builders and remodelers. We provide the layer spec for their drawings and coordinate with the tile setter.

    A blue single-story house with stone accents, a covered porch and a green lawn
    Foundation membrane and new drainage on this house in Mission Hills, finished in April.
    Kessler Waterproofing
    487 Landa St, New Braunfels, TX 78130
    (830) 555-0124 · office@kesslerwaterproofing.com

    Book a site visit

    Rosa will confirm a time within one business day. Site visits are free within 35 miles.

    Are you a
    Call (830) 555-0124 Site visit