Tennis court resurfacing in Ocala, done in about a week.
We repair cracks, level low spots, lay fresh acrylic color and stripe the lines on tennis and pickleball courts across Marion County. Dale Brennan quotes every job in person and runs the crew himself.
- Written quote within 2 days
- Most courts playable in 5 to 7 days
- 2-year workmanship warranty
Services and prices
Prices are for a standard 60 by 120 ft tennis court unless noted. Your written quote is fixed once we have walked the court.
| Service | What it includes | Price |
|---|---|---|
| Full resurface | Pressure wash, patch, 2 acrylic resurfacer coats, 2 color coats, new lines | $6,400–$9,200 |
| Crack repair | Rout, fill and bridge cracks with a flexible crack membrane, color-matched | from $650 |
| Low spot leveling | Flood test, fill birdbaths deeper than a nickel with patch binder | $450–$1,600 |
| Line striping | Tennis lines re-taped and painted, 2 inch width, textured line paint | $850–$1,300 |
| Add pickleball lines | Up to 4 pickleball courts laid out on a tennis court, contrasting color | $600–$1,400 |
| Net posts and net | Remove old posts, new sleeves set in concrete, commercial net and strap | $1,100–$1,500 |
| Clean and wash | Mold and mildew wash, leaf clearing, edges blown out | from $395 |
Signs your court is due
Florida sun and summer storms age a court faster than most owners expect. Most hard courts need a new color surface every 5 to 8 years.
- Hairline cracksThin cracks that grow each summer. Cheap to fix now, costly once they open past 1/4 inch.
- Water standing after rainIf a puddle still covers a nickel an hour after the rain stops, the ball will skid there.
- Faded or chalky colorThe surface rubs off on your hand. Players lose sight of the ball against it.
- Slick spots or mildewShaded corners turn green and slippery. A wash helps, a new texture coat fixes it.
- Lines peeling or grayCalls get argued. Restriping is a one-day job.
Rough price for your court
Pick what is closest. This is a range, not a quote: we confirm it after a free 20-minute visit.
A typical resurface, day by day
Coatings need dry weather, so we plan around the forecast and text you each evening with what is next.
- Day 1Wash and inspect
Pressure wash, blow out edges, mark every crack and low spot with chalk.
- Day 2Cracks and patches
Rout and fill cracks, flood test, level birdbaths with patch binder.
- Day 3Resurfacer
Two squeegee coats of acrylic resurfacer fill texture and hide repairs.
- Day 4–5Color coats
Two coats of sand-filled color in your choice of blue, green or red.
- Day 6Lines and walk-through
Taped, primed and painted lines. We walk the court with you before we invoice.
One small crew, one owner on every job
I started Marion Court Works in 2012 after nine years on a sports surfacing crew in Gainesville. Today it is me, my nephew Cody and two finishers, one truck and a trailer of squeegees. We do around 60 courts a year, which is the number we can do well.
Most of our work is HOA courts, private backyard courts and a few school and church courts around Ocala. I measure, quote and walk every job myself, so the person who promised you a finish date is the one on site.
- Since
- 2012
- Courts surfaced
- 640+
- Crew
- 4 people
- Warranty
- 2 years
What court owners say
★★★★★ 4.9 average from 112 Google reviews
“Our HOA court had cracks you could lose a ball in. Dale bridged them, leveled the baseline puddle and had us playing again in six days. Two summers later the cracks have not come back.”
“Quote was in my inbox two days after he came out, and the final bill matched it to the dollar.”
“Added four pickleball courts to our old tennis court. Lines are sharp and the colors look great together.”
Where we work
Based off SW College Rd in Ocala. No travel fee inside 45 minutes; beyond that we quote it up front.
- Ocalabase
- Silver Springs Shores15 min
- Belleview20 min
- Dunnellon30 min
- On Top of the World20 min
- The Villages35 min
- Summerfield25 min
- Williston30 min
- Gainesville45 min
- Citra25 min
- Inverness45 min
- Leesburg45 min
Questions we get every week
How long until we can play again?
Usually 5 to 7 working days for a full resurface, plus 24 hours after the last line coat. Rain days push the schedule back, and we will tell you the night before.
Can you fix cracks so they never come back?
Nobody honestly can on a slab that moves. Our crack membrane system bridges the crack and flexes with it, and we warranty it for 2 years. For badly broken asphalt we will tell you if an overlay makes more sense.
What colors can we choose?
Any standard acrylic color: the common pairs are blue inside with green outside, all green, or red clay color. We bring painted samples to the court check.
Can tennis and pickleball share one court?
Yes. We lay up to four pickleball courts on a tennis court in a lighter shade so the tennis lines stay clear. Portable pickleball nets sit inside the tennis net.
Do you work with HOAs and get board approval paperwork?
We do. You get a written scope, color samples, a certificate of insurance and a schedule you can hand to the board and post at the gate.
How do we pay?
30 percent to schedule, the rest at the walk-through. Check, card or ACH. No payment for anything you have not seen finished.
Rather talk it through? Dale picks up between coats, or calls back the same afternoon.
Call (352) 555-0147Book a free court check
Dale will call within one business day to set a time.